Industrial and Flex Construction in Centennial, Colorado

Service Areas

Industrial and Flex Construction in Centennial, Colorado

Owners of flex, aviation-support and light manufacturing space in Centennial need a builder who treats airport proximity as a design input, not a surprise at plan check. We build high-bay shells, equipment-ready slabs and office-heavy buildouts in a city that Interstate 25 roughly divides in half, and we plan building height, roof equipment and crane picks around the airfield from the first meeting.

The airport is a large, busy neighbor. A February 24, 2025 economic impact study credits Centennial Airport with 9,236 jobs and $2.4 billion in total business revenue for 2023, and the field recorded 360,725 aircraft operations that year, hosting more than 125 businesses. That activity feeds steady demand for avionics shops, aerospace light assembly, hangar-adjacent storage and the offices that sit beside them.

We talk about this market in clear heights, bay depths, door counts and the minutes between a front door and I-25.

Height, noise and flight paths on the drawing board

A site close to an active airport is reviewed differently when the building is tall or the equipment on top of it is. Roof-mounted exhaust stacks, antenna masts and the crane we use to set steel can each reach a height that triggers airspace review, so we establish early whether your parcel needs one. Where a crane is the issue we look at mobile alternatives and sequencing that keeps the boom low. A high-bay, crane-ready building designed with that in mind avoids a redesign when the review comes back.

Noise runs in both directions. Aircraft overhead is a daily fact for the office and lab space beside the field, so insulation, glazing and roof assemblies need an acoustic target written into the spec. An operation with compressors, dust collection or heavy truck traffic needs to know which neighbors will hear it. We set both targets with you before the envelope is priced.

A 2021 code base and what it means for your submittal

The Home Builders Association of Metro Denver tracker dated January 20, 2026 lists Centennial on the 2021 IBC, IRC and IFC with the 2018 IEC and no plans to adopt the 2024 I-codes. For an owner, that means your building is designed to the 2021 set, and your electrical engineer needs to know the city's listed electrical edition before gear is specified. We carry that question into the first design coordination meeting.

Centennial Airport sits in unincorporated Arapahoe County next to the city and spans Arapahoe and Douglas counties, so an airport-side parcel can involve more than one jurisdiction and more than one reviewer. We identify that on day one and sequence submittals so city plan check, any county review and any airspace notice run side by side instead of one after another.

The employers that shape demand

Per the city's 2023 financial report, Centennial's top employers include Comcast, UnitedHealth Group, Arrow Electronics, United Launch Alliance and CommonSpirit Health. Telecom, health care, electronics distribution and launch services point to a particular kind of industrial space: clean, power-heavy buildings with good clear height, controlled access and a lot of office. It looks more like technology flex than heavy plant, and our advanced manufacturing work fits that profile.

A supplier to employers like these usually needs a flex building more than a 40-door cross-dock: a few dock doors, a few drive-in doors, generous clear height and plenty of power. We build that flex and light industrial product with the electrical room and the slab sized for the equipment you will actually install.

What a Centennial buildout includes

Much of our work in the city is tenant-side. We strip an existing shell, cut and repour slab for equipment, bring in new electrical service, add mechanical for process or lab loads and finish the office that goes with it. For a user taking space from a landlord, industrial tenant improvements reach occupancy faster than a new shell, and we phase the work around neighbors who stay in the building.

For aviation users the scope shifts toward wide clear spans, hangar-style doors, floor drains and slabs that tolerate heavy wheel loads. Our approach to an aircraft hangar starts with the door opening required by the largest aircraft you plan to house and works back to the structure, the foundation and the fire suppression.

Where the budget moves in Centennial

Three things move the number on an industrial job here: clear height, power and the finish level of the office. Each added foot of clear height adds steel and wall panel, a power upgrade can cost more than the shell if the utility has to extend service, and an office finished to a corporate standard costs far more per square foot than a warehouse finish. We separate these in the estimate so you can see which one drives the total.

Airport-side parcels add a fourth driver, which is review time. A month spent waiting on an airspace determination costs more in carrying cost than most finishes do, so we start the filing early and carry an allowance for coordination. Neighbors such as Greenwood Village and Lone Tree share the I-25 corridor, and owners choosing between them should compare permit timelines as well as lease rates.

Check your parcel before you commit

Send us the address, the building you want and your clear height and power needs, and we will report back on airspace, code and schedule.

Questions Owners Ask

Will a building near Centennial Airport need an airspace review?

It depends on the parcel and on what rises above the roof. Tall racking buildings, stacks, masts and the cranes used to erect them are the usual triggers. We check the site against the airport's height surfaces before design, then plan structure and crane picks to the answer.

Which code edition applies to a new building in Centennial?

A Home Builders Association of Metro Denver tracker dated January 20, 2026 lists Centennial on the 2021 IBC, IRC and IFC with the 2018 IEC and no plans for the 2024 I-codes. Adoption plans change, so we confirm the edition with the city at the start of design and again at submittal.

How does airport activity affect our construction schedule?

The field recorded 360,725 aircraft operations in 2023, which averages close to 990 a day. That activity does not stop a site, but it drives crane planning, lighting on work areas and the height of temporary equipment. We build those limits into the logistics plan so nothing is learned the hard way mid-erection.

What does a flex building cost to fit out for light assembly?

The biggest swings are electrical service, floor flatness and the office share of the plan. A light assembly line wants three-phase power, compressed air and a flat slab, and none of that is in a base shell. We price those line items separately so a tenant can trade office area against equipment capacity.

Can you work in a building while other tenants stay open?

Yes. We use separate entrances, dust barriers, negative-air setups and scheduled noisy work, with shutdowns for utility tie-ins agreed in advance. Our phased construction in occupied sites approach keeps neighbors running.