Site feasibility, test fits, early pricing and schedule modeling for industrial owners weighing parcels in Aurora, along E-470 and across the east metro.
We run zoning, site plan, building, fire and utility approvals for industrial projects in Aurora, Adams and Arapahoe counties and the unincorporated east metro.
We buy, track and expedite switchgear, steel, dock equipment and rooftop units early so Aurora and east-metro industrial buildings open when the schedule says.
Repeatable industrial buildouts across several sites along E-470 and the east metro, with one prototype, one schedule and one team carried from site to site.
Water, sanitary sewer, storm, gas and power service lines for industrial sites in Aurora and the east metro, installed in one coordinated underground package.
Underground fire mains, looped hydrant systems, pumps and tanks for large Aurora and east-metro industrial buildings, installed to pass the fire marshal.
Reinforced concrete truck courts, trailer stalls and drive aisles for Aurora and E-470 distribution sites, built for turning radius, load and drainage.
Heavy-duty concrete dock aprons, leveler pits, bollards and loading zones for Aurora warehouses, plants and cold buildings, built for repeated truck loads.
Stabilized laydown yards for east Aurora plants and warehouses: graded, compacted and surfaced so steel, panels and trailers move on a fixed delivery clock.
Employee, visitor and trailer parking built on stabilized subgrade for Aurora industrial sites: base design, drainage, striping and ADA layout done together.
Heavy-haul access roads for Aurora and east metro plants: pavement sections, turning radii and utility crossings designed for oversize loads and daily trucks.
Rail spur site work for east metro industrial parcels: grading, subballast, drainage, crossings and unloading pads built to the serving railroad standards.
Yard lighting, duct banks and site electrical for Aurora truck courts and plants, designed around airport-adjacent glare, height limits and night shift safety.
Curbs, sidewalks, ramps and accessible routes poured to inspection tolerance on Aurora industrial campuses, with layout checked before concrete is placed.
Perimeter fencing, gates, operators, cameras and access control built as one system for Aurora plants, yards and warehouses, installed before the first truck.
Concrete pads and foundations for compressors, presses, chillers and process lines in east metro plants, built to vendor tolerances and vibration limits.
Tilt-wall plants, warehouses and flex buildings in Aurora and the east metro: slab casting, panel lifts, bracing and roof structure planned around dock counts.
Structural steel erection for Aurora plants, warehouses and process buildings: column layout, crane picks, bolting, plumbing and decking tied to the schedule.
Warehouse shell construction on the Aurora and E-470 corridor: slab, walls, roof, dock walls and utilities delivered ready for racking or tenant improvements.
Distribution center expansions for Aurora operators: added doors, bays and truck court built in phases around live shipping, with tie-ins planned early.
High-bay and crane-ready industrial buildings in Aurora and the east metro: runway beams, tall columns, airport height limits and floors built for point loads.
Structural steel mezzanines, conveyor catwalks and equipment platforms for Aurora and east-metro plants and warehouses, built to code and to your picking flow.
Front offices, dispatch rooms, break areas and supervisor suites built inside Aurora warehouses and plants, with separate HVAC, egress and clean power.
Tenant improvement construction for Aurora and east-metro warehouse, flex and manufacturing leases: docks, power, racking prep, offices and move-in schedules.
Flex and light manufacturing buildings for the Aurora east metro: variable bays, grade doors and docks, three-phase power, lab-ready cores and fast delivery.
Electrical, mechanical and security buildings for Aurora and east-metro data center campuses: switchgear houses, generator yards, chiller plants and gatehouses.
Ground-up freezer and cooler buildings for Aurora and east-metro operators: frost-proof slabs, insulated panels, refrigeration-ready structure and dock layouts.
Build and renovate pharmaceutical and biotech production space in Aurora: cleanrooms, process utilities, validated finishes and commissioning-ready turnover.
Fleet depots, service centers, wash bays and EV charging yards for Aurora and east-metro operators, built around vehicle counts, fueling and shift change flow.
Heavy-duty maintenance shops, drive-through service bays and equipment repair buildings for Aurora and east-metro operators, built for lifts, cranes and fluids.
Owner-user industrial condo buildings for Aurora and east-metro trades: drive-in doors, mezzanine-ready bays, separate meters and fast shell construction.
Saw-cut, remove and replace failed warehouse and plant slabs in Aurora and the east metro, with subgrade repair, doweled joints and phased forklift access.
Selective and full demolition of plants, warehouses, tanks and paving in Aurora and the east metro, with surveys, salvage, dust control and pad-ready sites.