Skip Navigation
Structural steel frame at an industrial building construction site

Service Areas

Planned and built for owners across Aurora and the east Denver metro.

Service Areas

Aurora

Warehouse, plant and truck court construction in Aurora, built to the city's 2021 code set and planned around door counts, E-470 exits and drive minutes.

Industrial and Flex Construction in Centennial, Colorado

Centennial

Flex, hangar-adjacent and light manufacturing construction in Centennial, planned around airport height limits, the 2021 code set and I-25 access.

Technical and Industrial Buildouts in Lone Tree, Colorado

Lone Tree

Power-heavy offices, data rooms and light-industrial space in Lone Tree, built to a corporate finish and sized for altitude, the 2023 NEC and I-25 access.

Heavy Industrial and Manufacturing Construction in Brighton, Colorado

Brighton

Plant, heavy-haul and equipment foundation construction in Brighton, planned around oversized loads, U.S. 85, State Highway 7 and E-470 access.

Industrial and Yard Construction in Castle Rock, Colorado

Castle Rock

Warehouse, shop and yard construction in Castle Rock, planned around expansive clay, rail corridors, I-25 Exit 184 and the 2018 code base.

Shallow-Bay and Flex Industrial Construction in Parker, Colorado

Parker

Shallow-bay, flex and contractor-condo construction in Parker, built around E-470 access, clay-aware slabs and the town's changing code timeline.

Campus Utility and Site Construction at Anschutz Medical Campus

Anschutz Medical Campus

Duct banks, equipment pads, dock aprons and phased work on the Anschutz Medical Campus, planned around live clinical space and R Line access.

Bioscience and Pharmaceutical Construction at the Fitzsimons Life Science District

Fitzsimons Life Science District

Lab shells, pharmaceutical support and demolition on the former Fitzsimons Army Medical Center site in Aurora, built to the 2021 code set.

Secure Yard and Aerospace Support Construction near Buckley Space Force Base

Buckley Space Force Base Area

Fenced yards, hangar-type bays and vendor flex space near Buckley Space Force Base, with access control and lighting drawn into the first set.

Greenfield Industrial Construction in Aurora Highlands, Colorado

Aurora Highlands

Mass grading, utilities, stormwater and industrial buildings for the Aurora Highlands, built on one schedule from raw ground to dock door.

Southlands

Truck courts, dock retrofits, ADA site concrete and flex space around Southlands and the Smoky Hill Road exit on E-470 in southeast Aurora.

Yard, Storage and Light Industrial Construction near Aurora Reservoir

Aurora Reservoir Area

Stormwater-first yards, shops and storage buildings in far southeast Aurora, built with spill containment and erosion control beside a drinking-water reservoir.

Warehouse and Truck Court Construction along the E-470 Corridor

E-470 Corridor

Warehouse shells, dock aprons and truck courts at Aurora's E-470 exits, priced by door count, trailer turns and drive minutes to the ramp.

Industrial Construction at Gaylord Rockies and the Aerotropolis

Gaylord Rockies Aerotropolis

Flex, distribution and process buildings near Gaylord Rockies and the aerotropolis: airspace-aware planning, truck courts, E-470 access and tilt-wall shells.

Industrial Tenant and Equipment Work in the Denver Tech Center

Denver Tech Center

Equipment rooms, generator yards, receiving docks and lab-grade fit-outs for technology tenants in the Denver Tech Center along I-25 and I-225.

Campus Expansion and Site Work in Greenwood Village

Greenwood Village

Generator yards, service drives, receiving upgrades and phased site work for occupied corporate campuses in Greenwood Village along I-25.

Foxfield

Contractor condos, small-bay flex and service-yard buildings in Foxfield, between Aurora and Centennial, with hail-aware roofs and compact site planning.

Yard, Shop and Metal Building Construction in Elizabeth

Elizabeth

Fleet shops, equipment yards and metal-framed warehouses along Highway 86 in Elizabeth, with site work, heavy slabs and high-elevation design built in.

Rail-Served and I-70 Industrial Construction in Bennett

Bennett

Shells, truck courts and rail-aware site work in Bennett on I-70, near the Colorado Air and Space Port, built to the 2024 codes the town now enforces.

Strasburg

Metal buildings, yards and heavy site work on county-reviewed parcels at Strasburg along I-70, with Adams and Arapahoe county code basics sorted up front.

Watkins

Shops, light industrial shells and yards on unincorporated Watkins ground beside Aurora and the Colorado Air and Space Port, with county review handled first.

Hangars and Rail-Served Industrial Buildings at the Colorado Air and Space Port

Colorado Air and Space Port

Aircraft hangars, aprons and rail-served industrial buildings at the Colorado Air and Space Port, with airfield coordination and coordinated heavy concrete.

Byers

Heated shops, equipment barns and storage buildings in Byers built for cold semi-arid weather, with county permitting and coordinated yard work.

Industrial Shops and Yards at Deer Trail on I-70

Deer Trail

Shops, equipment buildings and storage yards at Deer Trail, 55 miles out on I-70, with mobilization, drainage and expansion planned from the first meeting.

Operations Centers and Service Buildings in Highlands Ranch

Highlands Ranch

Industrial-grade operations centers, generator yards, renovations and service buildings in Highlands Ranch, with Douglas County review handled up front.

Site Civil and Industrial Buildings near Cherry Creek State Park

Cherry Creek State Park Area

Detention, drainage, laydown yards and light industrial buildings near Cherry Creek State Park and the dam, with groundwater and permits handled early.

ServicesBuilding TypesIndustriesService AreasAboutContactRequest a Project Review720-861-4529
Call720-861-4529