Skip Navigation
Structural steel frame at an industrial building construction site

Industries

Planned and built for owners across Aurora and the east Denver metro.

Industries

Advanced Manufacturing Construction in the Aurora Metro

Advanced Manufacturing

We build advanced manufacturing plants along E-470, I-70 and Brighton: slabs, equipment pads, utilities and permits handled together for plant managers.

Data Center Construction in Aurora and the East Metro

Data Centers

We build data center shells, duct banks and site packages on Aurora's east side, planned around utility power, airport height limits and energy code.

Cold Storage and Refrigerated Facility Construction in Aurora

Cold Storage and Refrigerated

We build freezers, coolers and refrigerated docks east of Denver, handling frost-heave design, expansive clay, slab pours and permits in one package.

Logistics and Distribution Construction on the E-470 Corridor

Logistics and Distribution

We build distribution centers, cross-docks and truck courts along E-470 and I-70, designed around dock counts, trailer stalls and rail access.

E-Commerce Fulfillment Center Construction in Aurora

E-Commerce Fulfillment

We build e-commerce fulfillment centers in Aurora and the east metro: automation-ready slabs, mezzanines, van lanes and parking built to a peak-season date.

Pharmaceutical and Life Science Construction in Aurora

Pharmaceutical and Life Sciences

We build pharmaceutical plants, lab shells and cleanroom support space in Aurora near Fitzsimons and Anschutz, with commissioning records ready at handover.

Utility and Power Facility Construction in the Aurora Metro

Utilities and Power

We build pump stations, control buildings, equipment pads and underground duct banks for utility and power owners in Aurora and the east metro.

Metals and Heavy Industry Construction in the Aurora Metro

Metals and Heavy Industry

We build fabrication shops, heavy slabs, drilled piers, haul roads and rail-ready sites for metals and heavy industry on the east side of the Denver metro.

Automotive and EV Facility Construction in Aurora

Automotive and EV

We build EV-ready fleet depots, service bays, parts buildings and light assembly space in Aurora, Parker and the east metro, planned around electrical capacity.

Food and Beverage Plant Construction in Aurora and the East Metro

Food and Beverage

We build food and beverage plants, washdown floors, utilities and cold storage in Aurora and east of Denver, with sanitary details and permits handled together.

ServicesBuilding TypesIndustriesService AreasAboutContactRequest a Project Review720-861-4529
Call720-861-4529