Skip Navigation
Structural steel frame at an industrial building construction site

Building Types

Planned and built for owners across Aurora and the east Denver metro.

Building Types

Warehouse Construction in Aurora and the East Metro

Warehouses

Warehouse shells, slabs, dock packages and truck courts built along E-470 and the east metro, planned around door count, trailer stalls and drive time.

Distribution warehouse and paved truck court

Distribution Centers

Distribution center construction for the E-470 corridor: cross-flow dock layouts, trailer parking, rail-served sites and the utilities that keep trucks moving.

Manufacturing facility interior with production equipment

Manufacturing Plants

Ground-up manufacturing plants and expansions in the east Denver metro: crane bays, heavy slabs, process utilities and phased startup around live operations.

Cold-storage loading area with insulated dock doors

Cold Storage Facilities

Cold storage and freezer buildings in the Aurora area: insulated panel envelopes, under-slab heave protection and refrigeration-ready docks.

Data Center Construction in the Aurora Area

Data Centers

Data center shells, power yards and mechanical plants built in the east Denver metro, with utility, cooling and commissioning plans set before the first pour.

Flex and Light Industrial Buildings in the East Metro

Flex and Light Industrial

Flex and light industrial buildings with drive-in doors, shallow bays and office fronts, built near E-470 and I-25 for tenants who need to start fast.

Tilt-Wall Building Construction in Aurora and the East Metro

Tilt-Wall Buildings

Tilt-up concrete industrial buildings for Aurora and the east metro: casting beds, crane picks, wind planning and a schedule built around the lift.

Pre-Engineered Metal Buildings in Aurora and the East Plains

Pre-Engineered Metal Buildings

Pre-engineered metal buildings for shops, warehouses and light industrial users from Aurora to the I-70 plains: foundations, erection, roofs and code review.

Truck Terminals and Cross-Dock Facilities in the East Metro

Truck Terminals and Cross-Docks

Truck terminals and cross-dock buildings for the Aurora and E-470 freight corridor: long door walls, concrete aprons, fueling, lighting and fast permits.

Food and Beverage Processing Plants in the Aurora Area

Food and Beverage Processing Plants

Food and beverage processing plants for the east Denver metro: washdown floors, hygienic zoning, wastewater, refrigeration and utility planning.

Logistics and Fulfillment Centers in Aurora and the E-470 Corridor

Logistics and Fulfillment Centers

E-commerce and logistics fulfillment centers on the E-470 corridor: pick mezzanines, van yards, big parking counts and the power to run sortation.

Aircraft Hangar Construction Near Aurora and the East Plains Airfields

Aircraft Hangars

Aircraft hangars for Aurora-area airfields: clear-span frames, large doors, fire protection, FAA height review and ground-lease approvals.

Automotive and EV Plant Construction in Aurora, Colorado

Automotive and EV Plants

Automotive and EV plant construction for the Aurora metro: supplier-tier plants, battery and charger assembly, heavy site civil and truck courts near E-470.

Office Building Construction in Aurora, Colorado

Office Buildings

Office building construction for plant and warehouse owners in the Aurora metro: headquarters wings, campus offices, site civil and fast turnover.

Medical Office Building Construction in Aurora, Colorado

Medical Office Buildings

Medical office construction near Anschutz, Parker, Lone Tree and Aurora Highlands: shell and core, imaging shielding, clinics and outpatient buildings.

Retail and Shopping Center Construction in Aurora, Colorado

Retail and Shopping Centers

Retail and shopping center construction along E-470 in Aurora: big-box shells, pads, parking fields, detention and site utilities built for fast openings.

Self-Storage Facility Construction in Aurora, Colorado

Self-Storage Facilities

Self-storage construction in the Aurora metro: drive-up and climate-controlled buildings, grading, drainage, expansive-soil slabs and fast lease-up delivery.

Hotel and Hospitality Construction in Aurora, Colorado

Hotels and Hospitality

Hotel and hospitality construction near the aerotropolis, Buckley and E-470: select-service, extended-stay and convention hotels with strong back-of-house.

Hospital and Healthcare Facility Construction in Aurora, Colorado

Hospitals and Healthcare Facilities

Hospital and healthcare facility construction for the Aurora metro: site utilities, central plant structures, concrete frames and logistics for live campuses.

Schools and Education Facilities

School construction in the Aurora metro: new campuses, additions, bus loops, athletic sites and summer-window renovations built to a fixed date.

Government and Municipal Buildings

Government and municipal construction in the Aurora metro: fire stations, public works yards, maintenance shops and utility structures to public rules.

Multifamily and Mixed-Use Construction in Aurora, Colorado

Multifamily and Mixed-Use

Multifamily and mixed-use construction in the Aurora metro: podium buildings, structured parking, site utilities and phased communities near rail and E-470.

Parking Structure Construction in Aurora, Colorado

Parking Structures

Parking structure construction for hospital, hotel, retail and office campuses in the Aurora metro: precast and cast-in-place decks with durable concrete.

ServicesBuilding TypesIndustriesService AreasAboutContactRequest a Project Review720-861-4529
Call720-861-4529