Detention basins and drainage structures decide what can be built near Cherry Creek State Park, and our work in this part of Aurora starts with water. Cherry Creek Dam, built by the U.S. Army Corps of Engineers in 1948 to 1950, is 141 feet high and 14,300 feet long at its crest and impounds Cherry Creek for flood control with a maximum capacity of 134,470 acre-feet. Any site that drains toward the creek, sits near the park edge or borders the reservoir carries the dam's presence into its design.
We build the site civil, service buildings and light industrial structures that surround a major public landscape. Cherry Creek State Park covers 3,346 acres around an 880-acre reservoir, dates to 1959, and recorded 2,685,860 visits in 2021, with Aurora as its nearest city. That kind of visitation shapes traffic on the roads around the park, the hours at which deliveries are tolerated and the standards neighbors expect from a nearby construction site.
The park has also hosted events as large as the 1993 papal mass for World Youth Day, a reminder that its surroundings can see sudden surges of people and vehicles. We keep a calendar of known events and plan heavy hauling, crane work and concrete placements around them.
Water, groundwater and soils near the creek
Sites near a creek and reservoir often have shallow groundwater, variable soils and floodplain mapping that affects where a building may sit. We obtain geotechnical borings that log the groundwater level, review floodplain maps and agree on a finished floor elevation with the reviewing authority before design is fixed. If groundwater is high, we plan dewatering for utilities and footings and decide whether the building should have a deeper, drained slab.
Runoff is the other half. A paved lot sends more water to the creek than a field does, and the reviewing agencies expect detention and water-quality measures. We design those facilities as part of the site rather than as an afterthought, using the land that cannot be built on to serve double duty.
Site civil first, then the building
Our scope here begins with stormwater detention and drainage: ponds, inlets, pipe, outfall structures and erosion control. We build them early because they also serve as temporary controls during construction, catching sediment before it leaves the site.
The building follows. Typical projects are service shops, light industrial buildings for contractors and distributors, and equipment storage, with stabilized laydown yards that hold materials without turning to mud. Slabs are designed for the soil conditions found in the borings, and trench drains and sumps protect floors from groundwater and washdown. For tenants comparing options, a flex light industrial building with a modest yard often suits creek-edge parcels better than a large distribution box, since the buildable area is shaped by setbacks and detention.
Permits, dam proximity and environmental review
Aurora lists the 2021 International Building Code and other 2021 I-codes with the 2023 National Electrical Code as its adopted codes, with city amendments, and a January 20, 2026 tracker lists Aurora on the 2021 IBC with an update expected in the 2027 cycle. Projects near the park may also touch state, federal and utility review, including floodplain permits, stormwater permits and approvals to work near drainage structures.
We run a permit matrix at the beginning of each project: which agency, which document, which fee and which review time. Environmental review for sites near a state park and a reservoir can add weeks, so we start those conversations early and keep the schedule honest.
Services that go together near the park
Fire protection and utilities are linked to drainage on most projects. Fire water loops and hydrant systems need to be laid out with detention and utilities in a single coordinated plan, with pipe crossings and elevations checked before trenching begins.
Older properties near the park sometimes need clearing before they can be redeveloped. The trade partners for demolition and slab replacement remove failed pavement and floors, sort material for recycling where possible and prepare the subgrade for new work. We also work with automotive and fleet users through automotive fleet facilities, which need wash bays, oil separators and sanitary connections near the creek. Owners in the broader automotive and electric vehicle sector ask about charging infrastructure, and we lay out conduit and pad locations while the trenches are open.
Protecting the creek and the public
Environmental controls are part of safety on this kind of site. We install perimeter silt fence and inlet protection before disturbing soil, keep fuel and chemical storage on secondary containment well away from drainage paths and inspect controls after every storm. A written stormwater plan is on site at all times.
Public safety is just as important. Hikers, cyclists and drivers share the roads near the park, so we use flaggers, signed detours and lit barricades, and we avoid parking trucks on road shoulders. Haul routes are chosen to stay off the busiest approaches on weekends.
Wildlife and water quality get attention as well. Work near the reservoir edge is scheduled to avoid nesting periods where they apply, spill response materials are staged at every fueling point, and washout for concrete trucks is contained and cleaned out rather than allowed to flow to the drainage. Crews are briefed on these rules at orientation and again whenever the work moves closer to the water.
Cost items specific to creek-edge ground
The costs that move on a project like this are detention volume, dewatering, deeper utilities and the extra review time. We price each as its own line and offer alternatives, such as underground detention to free surface land, or a smaller building that avoids the most expensive part of the parcel.
Owners comparing sites should also consider the cost of reaching other parts of the east metro. Ground near the Aurora Reservoir and in Southlands carries its own site conditions and review paths, and a short comparison before you buy helps avoid paying for a constraint you did not need.
Start with the water
Send the parcel and the use. We will return a drainage concept, a groundwater plan and an estimate that shows the site package separately.
Questions Owners Ask
Do I need a floodplain permit near Cherry Creek?
It depends on the parcel's position relative to mapped floodplains. We check the maps during due diligence, and if any part of the site is in the floodplain we plan for the permit and for elevation requirements.
How do you handle high groundwater?
We find it first, with borings, then design around it. That can mean dewatering during construction, a drained slab, sump systems or raising the finished floor. We price the options so you can decide.
Which code edition applies in Aurora?
Aurora lists the 2021 International Building Code with the 2023 National Electrical Code and city amendments, and the January 20, 2026 tracker shows the city staying on the 2021 IBC with an update expected in the 2027 cycle.
Can you build underground detention?
Yes. Underground systems cost more per cubic foot than ponds but release surface land for building or yard. We compare the two on a single parcel.
Will park events affect my construction schedule?
They can affect traffic on the roads around the park. We watch the calendar and avoid heavy hauling or crane lifts when crowds are expected.